I know copy and paste isn't as easy to implement into the timeline editor as many would assume but the possibility of copying full pages be possible? I just know when I'm testing new macro's out I hate to have to add all my other tested working macros to each page when trying to slightly modify my current set up with a new added macro I'm testing. I know a way to prevent this would be to add a page and just add that macro.
Would there ever be a way to load multiple vks files? Lets say for instance I Had a VKS file that I knew covered 6 pages (the first six). Would it be possible to load a second set (VKS file) that I knew only covered the pages 7-13? I know this would be big coding headache but I think having that ability would really make working with the software massively easier when testing out or trying out others VKS files without having to completely get rid of your setup and having to reconnect controller and resync to get back to your normal set if it didnt' end up being something you liked. Sorry if this is confusing I wish I could word it better
Would there ever be a way to load multiple vks files? Lets say for instance I Had a VKS file that I knew covered 6 pages (the first six). Would it be possible to load a second set (VKS file) that I knew only covered the pages 7-13? I know this would be big coding headache but I think having that ability would really make working with the software massively easier when testing out or trying out others VKS files without having to completely get rid of your setup and having to reconnect controller and resync to get back to your normal set if it didnt' end up being something you liked. Sorry if this is confusing I wish I could word it better